Training Modules ยป Integration
Integration
Case Study: Vegetated MSE Walls
Collaboration: Finding topsoil for the MSE walls was very important but there were no local sources. Topsoil was manufactured on site through collaborative effort of the road building contractor, the revegetation specialist, and the construction engineer.
